Pipelines

.....please click on the pictures (only on the right side) to enlarge.....

DETEK has extensive experience in the design and the construction supervision of outfalls and marine pipelines, being active in that market for over 25 years. In the last five years alone, DETEK has been involved in many underwater pipeline projects in Turkey, ranging in size from 150mm diameter to 2400 mm diameter, with lengths up to 12.910 m, and covering the full range of construction techniques, including bottom and off-bottom pipeline tow, J-lay installation ,Vented S-bend technique and segmental installation.
 
Natural Gas Line to Islands of Istanbul
Client : City of Istanbul Gas Distribution Network
Year : 2005-2006
Pipe : Concrete Coated 6” and 8” API 5LX65 Steel Pipe
Length : 12.100 m
Max. Water Depth : 35 m
Construction Method : Bottom Tow and J-Lay Instalation

Highlighs of The Project
First Turkish Marine Contractor to lay Submarine NGL Pipeline
First Use of HDPE Submarine Gas Line for R&D Purposes
Achievement of 140 tons of Pulling Forces During Installation


 

Water Intake Project of ICDAS Coal Fired Power Plant
Client : Icdas Power Plant Auhority
Year : 2004
Pipe : 2400 mm diameter SN 5000 GRP Pipe
Length : 210 m
Max. Water Depth : 19 m
Construction Method : Segmental Installation

Highlighs of The Project
First Cast-in Place Water Intake Structure By Tremie Concreting Technique at 19.0 m Water depth
Intake Structure is 265 ton at Dry Condition
1000 m3 of Rock Breaking at shore approaches.
 

Foça Deep Water Outfall Project
Client : TML Construction Co. (Main Contractor)
Year : 2002
Pipe : 560mm diameter HDPE PN6 Pipe
Length : 3750 m
Max. Water Depth : 50 m
Construction Method : Vented S-Bend Technique

Highlighs of The Project
The pipeline is installaed in twor stages and each stage last around 3 hours.
The pipeline was laid in an uniform alignment to meet the customer requirement
The diffuser section of the outfall was also installed with veted S-bend Technique
 

City of Antalya Deep Water Outfall Project
Client : STFA Marine Construction Co. (Main Contractor)
Year : 1998-1999
Pipe : 1.600mm diameter HDPE PN6 Pipe
Length : 2.550 m
Max. Water Depth : 50 m
Construction Method : Vented S-Bend Technique

Highlighs of The Project
The World Record at the time being for Installing tyhe longest (2550 meters) HDPE pipeline at one sinking operation.
The sinking Operation completed in 3.5 hours.
The pipeline was made up 5 pieces each around 500 meters long.
Pipes are extruded in Norway and towed to City of Antalya in 45 days.
 

Bagfas Fertilizer Plant Water Intake Project
Client : Bagfas Fertilizer Company (Owner)
Year : 1998
Pipe : 1600mm diameter HDPE PN6 Pipe
Length : 350 m
Max. Water Depth : 20 m
Construction Method : Vented S-Bend Technique

Highlighs of The Project
The pipeline is installed at single sinking operation
The first use of self cleanning water intake filter system developed by Taproge of Germany



 

Northern Cyprus Water Supply Project
Client : STFA Marine Construction Co. (Main Contractor)
Year : 1997-1998
Pipe : 560mm diameter HDPE PN10 Pipe
Length : 1.800 and & 2.300 m
Max. Water Depth : 35 m
Construction Method : Vented S-Bend Technique

Highlighs of The Project
First Use of 20.000 tons capacity Water Bags for Fresh WaterTrnasportation
The first use of Star Shape Concrete Collars foe Stability Purposes
 

 

Aydıncık (TR) - Cyprus

Underwater storage operation of the prepared pipes

 

dfp-032.jpg (49928 bytes)
Pipeline and part compansator installation dfp-026.jpg (58456 bytes)
Underwater works dfp-027.jpg (65583 bytes)
Sea discharge, weight pipe blocks installation works dfp-034.jpg (53237 bytes)
Water discharge,   weight pipes (installation completed) dfp-039.jpg (56257 bytes)

 

...please contact us for more information...